RENOPLAN SYSTEM 1

What is the quickest and easiest method to protect against subfloor moisture?

When installing flooring in areas where subfloor moisture is a problem, traditional damp proofing methods can take as long as 1 or 2 days. With the UZIN L3 Gold Moisture Control System floors can be installed in as little as 4 hours and is ideal for projects with time constraints or refurbishment work. The system has been developed to improve UZIN L3 Gold in areas of high moisture (up to 90% RH) and is exceptionally simple to use.

<p>Prepare the substrate as normal i.e. the substrate must be sound, load-bearing, dry, free from cracks, clean and free from materials which would impair adhesion such as dirt, oil, grease, laitance or adhesive residues. The substrate must also be made absorbent so grind or lightly shot blast if necessary i.e. polished concrete.</p>

Prepare the substrate as normal i.e. the substrate must be sound, load-bearing, dry, free from...

<p>Thoroughly vacuum any dirt and dust with an industrial vacuum cleaner. Allow UZIN L3 Gold System Primer to reach room temperature. Shake well and then decant into a clean, oval bucket.</p>

Thoroughly vacuum any dirt and dust with an industrial vacuum cleaner. Allow UZIN L3 Gold System...

<p>Apply one even coat of UZIN L3 Gold System Primer over the entire substrate using a foam roller and allow to dry for 1 hour*. </p>

Apply one even coat of UZIN L3 Gold System Primer over the entire substrate using a foam roller and...

<p>Mix the smoothing compound components UZIN L3 Gold Powder and UZIN L3 Gold Moisture Control Liquid together until smooth and free from lumps.</p>

Mix the smoothing compound components UZIN L3 Gold Powder and UZIN L3 Gold Moisture Control Liquid...

<p>Apply the smoothing compound over the floor using a screed rake or steel trowel at depths from 3 mm to 5 mm. Then remove any air using a spike roller and allow to dry. After 2 hours it should ready to accept most floor coverings*.</p>

Apply the smoothing compound over the floor using a screed rake or steel trowel at depths from 3 mm...

<p>Choose a suitable adhesive for installing the floor covering such as UZIN KE 2000 S for PVC, lino or luxury vinyl tiles.  Apply evenly onto the substrate using a suitable notched trowel.  Install covering, rub down over the whole area and after approximately 20 minutes, rub down again or roll.</p>

Choose a suitable adhesive for installing the floor covering such as UZIN KE 2000 S for PVC, lino...

*Under normal conditions at 20°C and 65% relative humidity. See product data sheets for more information.